Skip to main content

SCDOT issued this status update:

We're aware of an issue on the Ben Sawyer Bridge that requires further inspection and potential repair. The bridge is closed to traffic. Inspection crews are en route, and we will provide updates as they become available. In the meantime, we ask drivers to use alternative routes.

Barricades will be placed at Station 22.5 and Myrtle Avenue. Local traffic will only be allowed beyond the barricades. Please drive with caution.

Sign up for Everbridge, the Town’s Emergency Notification System, to receive emergency texts and emails, and the Town's Monthly Newsletter to stay up to date on all of Town's meetings, projects and special events.

 

Stormwater project update map between Station 27 and Station 32.

 

The pond at Station 28 1/2 is currently not considered safe for recreational use due to high bacteria levels. 

 

Mission CIT, LLC has been contracted to complete a Fire and Rescue Department Assessment for the SI Fire Dept. To gain a better understanding of your local fire rescue department, as someone from the community, they are interested in your perspective.  Please visit the Fire Department page to learn more and take this survey by clicking here. 

Nature Trail Phase II: Trail Construction Services

Boardwalk

Date Advertised - March 28, 2024

Project Summary:

The Town of Sullivan’s Island seeks a qualified site work contractor to perform minor trail construction, path clearing and minor grading of sand for a second phase of the Sullivan’s Island Nature Trail planned between the Station 16 Street and Station 18.5 Street beach paths.

Background:

Phase II of the nature trail is partially funded through a 2023 South Carolina Parks, Recreation, Tourism (SCPRT) Grant, administered by way of their 2023 Recreational Trails Program. This section of the trail is intended to provide the public with a non-motorized pedestrian access between the National Park Service’s Fort Moultrie property and the Sullivan’s Island Lighthouse property located at Station 18.5 (Map link). The trail section will also be a continuation of the existing Phase I loop originating on the seaward (southern) side of the Station 16 Street beach path, and will link to the eastbound trailhead of Phase II.

The trail’s construction will be of a naturally compacted and graded sand with a linear distance of approximately ¾ of a mile (3900’). No external delivery of sand will be needed. The trail will be 8’ to 10’ feet wide and traverse relatively low and undulating secondary dune topography. The contractor will be tasked with general clearing of brush, vines and shrubs along the marked path. No trees are to be removed.

Project Documents:

Bids

Please see below for the bids received by the Town of Sullivan's Island.