Skip to main content
The Official Web Site of the State of South Carolina

Please sign up for the Town’s newsletter to stay up to date on all Town meetings, projects and special events. Click here to sign up today!  To view the December Sullivan’s Island Newsletter click here.

 

Stormwater Master Plan- Final Draft by Seamon Whiteside Associates

 

Breach Inlet has restricted access due to the current sand refurbishment project.

Island-Wide Stormwater Improvement (SCIIP)

Island-Wide Stormwater Improvement: Basins at Station 16, 25, 28.5 and 31 (SCIIP- South Carolina Infrastructure and Investment Program)

The Town of Sullivan’s Island is issuing this Request for Qualifications (RFQ) for a qualified civil engineering firm to provide a full range of engineering services to improve the functionality and capacity of stormwater drainage in four separate service areas of the Island: Station 16, Station 25, Station 28.5 and Station 31 watersheds. The project’s proposed scope and construction activities generally consist of increasing conveyance for stormwater main lines, making ancillary improvements to lateral lines, and incorporating tidal backflow prevention and manufactured treatment devices (MTD) at each outfall. A more detailed project description is noted in the SCIIP Application awarded by the South Carolina Rural Infrastructure Authority (RIA) through the South Carolina Infrastructure Investment Program (SCIIP); Grant #A-23-C188 and RIA State Grant #S-23-C188.

Questions regarding the proposal should be directed in writing to Joe Henderson at jhenderson@sullivansisland.sc.gov. The full Proposal Process can be viewed by clicking the link below.

SCIIP Final Plans