The Town of Sullivan's Island proposes to complete the design and implementation of the stormwater drainage outfalls improvements at Station 18.5 Street and Station 25 Street because of high-volume coastal flooding and rainfall events. The Town will complete Phase 1 of the project, which consists of the non-construction activities necessary to plan, survey, engineer, design and permit the proposed project.
Phase 1 Deliverables should include:
Project Documents