Floodplain Info
Learn More
Sign up for Everbridge, the Town’s Emergency Notification System, to receive emergency texts and emails, and the Town's Monthly Newsletter to stay up to date on all of Town's meetings, projects and special events.
Stormwater Master Plan- Final Draft by Seamon Whiteside Associates
Breach Inlet has restricted access due to the current sand refurbishment project.
Town Hall will be closed on Monday, January 20, 2025 in observance of Martin Luther King Jr. Day.
The Town of Sullivan’s Island proposes to construct drainage improvements in two priority sub-basins:
The drainage improvements are intended to provide drainage and alleviate flooding including reoccurring structural flooding with the basins. The improvements will include installing new pipes, inlets, swales, stormwater pump stations, and structures while re-establishing existing open channels and swales where possible.
Project Total $5,829,214.00
Project Documents